That the senate authorise the repair and rebuilding of the Blood Red River Museum in Tassato. This will also create the title "Curator of the Blood Red River." This will be a tenured position, a League citizen, selected by unanimous vote of the League senators. Self-funded.

Proposed Tassato, Seconded Temeschwar

Overview

  • Commissions repairs of the Blood Red River Museum in Tassato
  • Further details on the Blood Red River Museum, and what the repairs mean, can be found here
  • Passed

Date

  • Summer 384YE

Cost

  • As detailed in the wind of fortune
  • 15 wains of white granite
  • 15 wains of weirwood
  • 150 crowns in labour and art costs
  • Three months to construct

Progress

  • 2 crowns provided by Ergot after Autumn Equinox 384YE
  • 1 crown provided by Cpt. Hendrick van Hoven after Autumn Equinox 384YE
  • 1 throne provided by Rafael Barossa d'Apulian after Winter Solstice 384YE
  • 1 crown provided by Harwyn Eternal after Winter Solstice 384YE
  • 2 rings in small donations provided after Winter Solstice 384YE
  • 17 thrones 1 crown 18 rings, 15 wains of weirwood and 15 wains of white granite provided by Astrid Fjellrevening Rezia di Tassato after Spring Equinox 385YE

Outcome