Construct Jarmish Docks
(Created page with "<ic>To build the Jarmish Weirwood docks in Cargo, to be designed by the Asavean Architect <i>Proposed by Kallavesa, Seconded by Redoubt</i></ic> __NOTOC__ ===Overview=== * A...") |
(No difference)
|
Revision as of 23:41, 27 April 2017
To build the Jarmish Weirwood docks in Cargo, to be designed by the Asavean Architect
Overview
Date
- Winter 380YE
Cost
- 15 wains of weirwood
- 15 wains of white granite
- 60 crowns in labour costs
- 3 months to construct
Progress
- Unknown
Campaign Outcome
- There are necessary details missing from this motion, Senator Kallavesa may decide on these.