Construct Department of Architecture
Line 17: | Line 17: | ||
{{CommissionProgress|Temeschwar_University_Department_of_Architecture}} | {{CommissionProgress|Temeschwar_University_Department_of_Architecture}} | ||
==Outcome== | ==Outcome== | ||
* | * Now that construction is complete the [[Master of Rings]] will be available to appoint by [[Tally of the Votes]] for the first time at the Summer Solstice 385YE | ||
==Constitutional Notes== | ==Constitutional Notes== | ||
* The motion specifies that the title can be revoked by the League assembly, General assembly, and Assembly of Nine. This is not possible for a title appointed by the [[Tally of the Votes]]. | * The motion specifies that the title can be revoked by the League assembly, General assembly, and Assembly of Nine. This is not possible for a title appointed by the [[Tally of the Votes]]. | ||
* After much discussion the Constitutional Court have chosen to ask for an [[385YE_Spring_Equinox_Senate_sessions#Amend_the_Master_of_Rings|administrative motion at the Spring Equinox]] to clarify this. | * After much discussion the Constitutional Court have chosen to ask for an [[385YE_Spring_Equinox_Senate_sessions#Amend_the_Master_of_Rings|administrative motion at the Spring Equinox]] to clarify this. |
Latest revision as of 18:17, 25 June 2023
A motion to construct the Temeschwar University Department of Architecture. Location: Hanuri, Temeschwar. Cost: 60 wains of white granite, 30 wains of weirwood, 180 crowns, 6 months. Effect: creates Imperial Title "Master of Rings". Imperial Title: Master of Rings. Appointment: Annually, League Tally of the Votes. Removal: National League Asssembly/General Assembly/Assembly of Nine. Powers: One civilian build commission a season, and access to a white granite, mithril, weirwood ministry. Responsibility: To use their power to generate as much wealth as possible for the merchant-princes of Temschwar, and for the League, as possible.
Proposed: Temeschwar, Seconded: SemmerholmOverview
- Construct the Department of Architecture as detailed in the Back in the same place wind of fortune
- Passed
Date
- Winter 384YE
Cost
- As per the wind of fortune
- 60 wains of white granite
- 30 wains of weirwood
- 180 crowns
- Six months to complete
Progress
- 9 thrones 1 crown, 20 wains of weirwood and 15 wains of white granite provided by Asael after Winter Solstice 384YE
- 3 thrones 3 crowns and 20 wains of white granite provided by Giuseppe Sanguineo von Temeschwar after Winter Solstice 384YE
- 10 thrones, 3 wains of weirwood and 4 wains of white granite provided by Laughlan Vi Temeschwar after Winter Solstice 384YE
- 2 wains of weirwood and 1 wain of white granite provided by Karo Di Yedinso after Winter Solstice 384YE
- 5 wains of weirwood and 20 wains of white granite provided by Laughlan Vi Temeschwar after Spring Equinox 385YE
Outcome
- Now that construction is complete the Master of Rings will be available to appoint by Tally of the Votes for the first time at the Summer Solstice 385YE
Constitutional Notes
- The motion specifies that the title can be revoked by the League assembly, General assembly, and Assembly of Nine. This is not possible for a title appointed by the Tally of the Votes.
- After much discussion the Constitutional Court have chosen to ask for an administrative motion at the Spring Equinox to clarify this.