No edit summary
mNo edit summary
Line 1: Line 1:
{{Senate Motion}}
[[Category:Senate Motion]][[Category:383YE Autumn]]
__NOTOC__
<ic>To build the Iron Roads across Varushka. Cost 200 WG, 400 Cr, 1 year to complete, one commission to Senate.<br>
<ic>To build the Iron Roads across Varushka. Cost 200 WG, 400 Cr, 1 year to complete, one commission to Senate.<br>
''Proposed by Ossium, seconded by Miekarova''
''Proposed by Ossium, seconded by Miekarova''

Revision as of 13:27, 21 January 2022


To build the Iron Roads across Varushka. Cost 200 WG, 400 Cr, 1 year to complete, one commission to Senate.

Proposed by Ossium, seconded by Miekarova

Outcome

  • Construct the Iron Roads, taking advantage of the opportunity presented by skilled Varushkan roadbuilders
  • Passed at 100 thrones

Date

  • Autumn 383YE

Cost

  • Non-standard costs apply as detailed here.
  • 200 wains of white granite
  • 400 crowns labour cost
  • one year to construct
  • 50 thrones and 50 wains of white granite provided by Vitaly Grigorovich Dukov after Autumn Equinox 383YE
  • 1 wain of white granite provided by Lieselotte van Holberg after Autumn Equinox 383YE
  • 50 wains of white granite provided by Vitaly Grigorovich Dukov after Winter Solstice 383YE
  • 25 wains of white granite provided by Vitaly Grigorovich Dukov after Spring Equinox 384YE
  • 25 wains of white granite provided by Tomasz after Spring Equinox 384YE
  • 24 thrones 4 crowns provided by Vesna Borkovna Prochnost after Spring Equinox 384YE
  • 25 wains of white granite provided by Vitaly Grigorovich Dukov after Summer Solstice 384YE
  • 25 wains of white granite provided by Borz nikoli strazkovitch after Summer Solstice 384YE
  • 35 wains of white granite provided by Vitaly Grigorovich Dukov after Autumn Equinox 384YE
  • 34 wains of white granite provided by Vitaly Grigorovich Dukov after Winter Solstice 384YE

Campaign Outcome